• Favourites
1 results

Troy Lee Designs Grey Troy Lee Design Flowline Scripter L/S jersey 2023

Troy Lee Design Flowline Scripter L/S jersey
Troy Lee Design Flowline Scripter L/S jersey 1.Image
Troy Lee Design Flowline Scripter L/S jersey 2.Image
Troy Lee Design Flowline Scripter L/S jersey 3.Image
Troy Lee Design Flowline Scripter L/S jersey 4.Image
Troy Lee Design Flowline Scripter L/S jersey 5.Image
Troy Lee Design Flowline Scripter L/S jersey 6.Image
26 990 HUF
from 17 990 HUF  
You save 9 000 HUF (33%)
Including VAT , Excluding shipping costs
In stock

With our brand DNA embedded in racing, we all needed something to ride in for an easy ride without the race fit and bells and whistles, we still like to feel good and look good, so we created the flowline jersey collection. Casual fit and style for an easy ride with the buddies but with casual sportswear looks on the trail.

  • TLD Dura Knit fabric
  • Ride Fit
  • Wicking and quick-drying fabric
  • Fabric is certified Bluesign approved
Article nr.: TLD34691600
General Information:
About us:
1036 Budapest Pacsirtamező u.16.
Mo-We:10-18h, Th:10-19h, Fri:10-18h, Sa:10-15h
k2[a]k2shop.hu
This page uses cookies. Cookies are used to enhance the user experience, analyse website traffic and provide personalised content
Privacy settings